Clear the Room Before the Crew Arrives
Secure, gated 20 ft and 40 ft storage units right here in Davenport, Iowa. Move your furniture out of the dust and let contractors work in an empty room β month-to-month, with drive-up access whenever you need something back.
- 20 ft & 40 ft Units
- 24/7 Video Surveillance
- Drive-Up Loading
- No Long-Term Contract
Whatever You're Tearing Out, We'll Hold the Rest
Contractors work faster in an empty room, and your belongings stay out of the dust, paint and traffic. Here's what Davenport homeowners typically store during a project.
Kitchen Remodels
Store the dining set, small appliances, dishware and pantry contents while cabinets come out and countertops go in. Kitchens are the messiest room to work around.
Bathroom Renovations
Clear linens, cabinetry and hallway furniture near the work zone. Tile dust travels farther than most homeowners expect.
Flooring & Refinishing
Every piece of furniture has to leave the room for hardwood refinishing, carpet replacement or new tile. Store it rather than shuffling it house to house.
Basement Finishing
Most Davenport basements are already storing something. Empty it out completely so framing, drywall and egress work can move without obstacles.
Whole-Home Painting
Move furniture out instead of pushing it into piles under plastic. Painters cut faster and cleaner in a room with nothing in it.
Additions & Gut Jobs
For long projects, store the contents of entire rooms for months at a time and bring things back as each space is finished.
Two Sizes, Sized for Real Projects
A 20 ft unit covers a few rooms of furniture. A 40 ft unit handles a full gut renovation, including materials and a vehicle displaced from the garage.
Single-Room to Mid-Size Projects
The right fit for a kitchen, bathroom or flooring job where two or three rooms need to be emptied out.
- Furniture from 2β3 rooms
- Dining set and living room pieces
- Appliances pulled during demo
- Packed boxes and pantry contents
- Rugs, artwork and light fixtures
Whole-Home & Long Projects
Built for gut renovations, additions and multi-month timelines where the whole house has to come out at once.
- Contents of an entire home
- Vehicle displaced from the garage
- Garage and workshop equipment
- Building materials and fixtures
- Cabinetry and appliances being reused
Renovation starting soon? Units are available now.
Reserve online in under two minutes β no obligation, no card required to hold your space.
An Empty Room Is a Faster Room
Most renovation damage doesn't come from the demo. It comes from furniture shoved into the next room, covered in a sheet, and bumped into for six weeks straight while crews carry material past it.
Moving your belongings offsite protects them from dust and scratches, and it gives contractors clear floor space to work. Projects finish faster when nobody has to work around a sectional.
- Protect furniture from drywall dust and paint
- Give crews clear, open floor space
- Avoid piling rooms with displaced belongings
- Keep walkways safe while work is underway
- Store salvaged fixtures and cabinetry
- Extend month to month if the timeline slips
How It Works
- Pick 20 ft or 40 ftTell us which rooms are coming out and we'll size it.
- Reserve OnlineBook ahead of your demo date so it's ready.
- Load Before Demo DaySign digitally, get your gate code, drive right up.
- Move Back In StagesPull items out room by room as work finishes.
Built to Handle Iowa Seasons
Renovations run long, and a project that starts in October ends in February. Our facility keeps your belongings in the condition they left the house.
Local to Davenport
One facility, one city. A short trip from the job site when you need something mid-project.
Gated & Coded
Personal keypad entry, perimeter fencing and 24/7 HD camera coverage across the property.
Drive-Up Loading
Back the truck right to your door. Move a sectional in one trip instead of down a hallway.
Month-to-Month
Timeline slipped? Keep the unit another month. Finished early? Give notice with no penalty.
Load It Once, Load It Right
A little planning on load-in day saves you three trips back to the unit mid-project.
Pack by Room, Not by Type
Group everything from one room together. When that room is finished, you pull one section out instead of hunting through the whole unit.
Load Last-Finished First
Put items from rooms finishing last at the back. Whatever comes home first should sit near the door.
Leave a Center Aisle
Load along both walls with a walkway down the middle so you can reach anything without unloading half the unit.
Cover With Cloth, Not Plastic
Sheets and moving blankets let wood and upholstery breathe. Sealed plastic traps moisture against the finish.
Bag and Tape Hardware
Break down bed frames and table legs, then tape the labelled hardware bag to the underside of the piece it came from.
Photograph Before You Wrap
A quick photo of each piece and how it was assembled makes reinstallation far easier three months later.
Serving Renovation Projects Across Davenport
We're a single Davenport facility β convenient to job sites right across the city.
What Davenport Homeowners Say
"Emptied the whole main floor before the flooring crew came. They finished two days ahead of schedule because they weren't working around our furniture."
"Our kitchen remodel ran six weeks past the estimate. Month-to-month meant we just kept the unit instead of scrambling for another option."
"Took the 40 ft during our basement finish so the car had somewhere to go too. Backed the trailer right up to the door and were done in an afternoon."
Renovation Storage FAQs
Which size do I need for my renovation?
A 20 ft unit handles two to three rooms of furniture, which covers most kitchen, bathroom and flooring projects. Go with the 40 ft for a gut renovation, an addition, or when the garage has to be emptied and a vehicle needs somewhere to park. Tell us which rooms are coming out and we'll size it with you.
What if my project runs longer than planned?
Renovations almost always do. Every unit is month-to-month, so you simply keep it another month. There's no contract to extend and no penalty either way.
Can I get to my things during the project?
Yes. Gate access runs 6AM to 10PM every day, including weekends. Grab a box, pull a piece of furniture back once a room is finished, or drop off more as demo moves through the house.
Can I store building materials and fixtures?
Yes β lumber, tile, cabinetry, doors, trim, light fixtures and salvaged pieces are all fine. The exceptions are flammable and hazardous materials: no paint, solvents, propane tanks or fuel of any kind.
Can my contractor access the unit?
Access is tied to your gate code, so anyone you share it with can get in. Most homeowners prefer to handle load-in themselves and keep the code private.
Where exactly are you located?
We operate one facility here in Davenport, Iowa. No scattered sites and no confusion about which location holds your unit.
Ready to Clear the Room?
Reserve your 20 ft or 40 ft unit before demo day. No card required, no obligation, month-to-month from day one.